Today two carpenters installed a replacement window in the second floor bathroom. Since 1986 I have been talking about uncovering the window that previous owners had put drywall over.
If we hadn't had a leak in the third floor bath, I would still be wishing I had one. Since we did not discover the leak until the next day, most of the plaster ceiling was waterlogged.
After I tore out the lath and plaster, I grabbed the reciprocating saw to investigate the window. They had removed the entire window leaving the triple track storm on the outside. They also taped a window blind on it so from the outside it looked as if the window were still there.
The new window is lovely. Now we just have to remodel the bathroom to meet this new standard.
Subscribe to:
Post Comments (Atom)
I Don't Feel Older
but I am. And yes, it certainly beats the alternative. My Sweetie showered me with thoughtful gifts. My card and gift at breakfast. ...
-
While Mike the Contractor patched walls and Clay the floor guy sanded and stained the floor in the small hall on the second floor, I was ent...
-
We almost have a shed! Now that's progress. The roof ridge and the rafters on the end are up. In less than an hour all the rafters are a...
-
My Sweetie and I decided that we would go to the Cain Park Arts Festival just to have dinner and enjoy looking at the art. We did indeed hav...
No comments:
Post a Comment