This morning Mike Foster, our general contractor, dealt with all of the issues. Most were a result of miscommunication.
Now the pocket door to the half bath is in the right place. The sewer line is re-routed so that it is no longer under the front porch. This took most of the day since they had to hand-dig the rest of the trench and use a jackhammer and a sledge to break up a mini-boulder and a large mass of concrete and bricks. It was hard work. While we were away, they had dug for two days in the rain; then the trench caved in. I think that they are all relieved that it is done. As Lucas said, they are going to sleep well tonight.
After the workmen left, I removed wallpaper from the kitchen and half bath in preparation for the drywall finishers to begin on Wednesday.
While Mike was here, Bob Carpenter from Swiss Woodcraft called to confirm that the cabinets will be delivered on Monday. It is really coming together.
I am excited again.
Subscribe to:
Post Comments (Atom)
I Don't Feel Older
but I am. And yes, it certainly beats the alternative. My Sweetie showered me with thoughtful gifts. My card and gift at breakfast. ...
-
While Mike the Contractor patched walls and Clay the floor guy sanded and stained the floor in the small hall on the second floor, I was ent...
-
We almost have a shed! Now that's progress. The roof ridge and the rafters on the end are up. In less than an hour all the rafters are a...
-
My Sweetie and I decided that we would go to the Cain Park Arts Festival just to have dinner and enjoy looking at the art. We did indeed hav...